Project Engineer
Dreyer's Grand Ice Cream
 Bakersfield, CA

To handle the introduction of new fixed assets into the company. This could involve the relocation and optimizing of the existing fixed asset base and/or the purchase of new fixed assets. It may extend from the initial conceptual studies through to project closeout.

PRIMARY RESPONSIBILITIES:

Management Responsibilities:

  • coordinate personnel (e.g. other project engineers, technicians, contractors etc.) to ensure the projects objectives are satisfied.
  • propose and control the cost of the project
  • propose and monitor the project
  • demonstrate and promote the company's values

Functional Responsibilities:

  • ensure that one exhibits an attitude of absolute intolerance for unsafe situations and never implement any change, whether directly instructed to, or under your own initiative, without first questioning its impact in relation to product safety/quality, people safety and the environment. No compromises will be tolerated.
  • ensure that the highest principles of ethical conduct on behalf of the community, consumer, company, and the engineering profession are adhered to and that all dealings are maintained within a competitive and fair environment and above reproach.
  • support and encourage clear and open communication between the team members and related stakeholders, e.g. site and market management, PTC, CO Engineering, CT Packaging and the SBU.

Specific responsibilities relating to the conceptual study phase (feasibility & approval):

  • ensure that all projects are designed for the long term and result in a positive impact on the company ROI.
  • thoroughly challenge the supporting documentation even if it is provided by other functions.

Specific responsibilities relating to the design phase:

  • ensure that all assets are well designed (i.e. plant layout, equipment selection etc.) fit the business purpose through applying new technologies, proven principles, thorough design reviews and basic science.
  • support all Value Engineering Analysis (VEA) studies.
  • ensure that the design is directed towards a low cost, highly efficient and flexible operation.

Specific responsibilities relating to the implementation phase:

  • ensure safe work sites at all times and installations that are easy to operate, clean and maintain as well as guaranteeing after commissioning the safe, consistent manufacture/distribution of quality products.
  • ensure that when working with external engineering services, contractors, suppliers etc. that the scope, deliverables, performance and milestones are clearly detailed and agreed up front.
  • ensure that a progress report is prepared for all projects on a monthly basis.

Specific responsibilities relating to the start-up/close out phase (commissioning/final report):

  • ensure that the project scope is achieved within the agreed cost and timing.
  • ensure that the operators, mechanics, electricians etc. are effectively trained and that the transfer of the equipment to the client is both smooth and efficient. This includes all the supporting documentation that will be required by the client to operate and maintain the plant. e.g. operating instructions, equipment manuals, plant layouts, maintenance instructions, spare parts listing etc.
  • manage the allocation of all expenditures to clearly defined assets and the entry into the assets register.
  • complete the project file and ensure that it is handed over to the client.
  • complete a final report on all projects and ensure that this is circulated to the key stakeholders.